Schedule Of Material Submittals

Construction materials submittal and shop drawing approval process presents that must be clearly managed, as problems during submittal review can lead to incorrect product installations, and other costly mistakes. so there is a need to establish a material submittal and approval. Schedule of material submittals (af form 66) no. of copies required to be completed by project engineer 85 geothermal loop heat exchanger 3 23 21 15 86 well drilling procedure, pressure testing procedure, and as built drwg's 3 1 23 21 15 87 hydronic systems treatment 3 1 23 25 00 88 ductwork layout drawings, filters, smoke dampers, and fire. Once the design professional receives the submittal schedule, the design professional will review the schedule to verify that all equipment and materials are listed on the schedule and confirm.

drawing transmittal form template - Teacheng.us

Drawing transmittal form template - teacheng.us

Lesson 7 part 1 Add shop drawings submittals and approvals ...

Lesson 7 part 1 add shop drawings submittals and approvals

Pin Of-shop-drawings-submittal-log-1024x286-how-to-create ...

Pin of-shop-drawings-submittal-log-1024x286-how-to-create

Schedule of material submittals to be completed by project engineer to be completed by contract administrator no. of copies required line number item or description of item, contract reference, type of submittal certification of compliance shop drawings samples color selection. Schedule of material submittals . project number . 42150024 . project title: area . fy-16 phase2 . solicitation/contract number . to be completed by project engineer. to be completed by contract administrator ; line number: submittal numbers; item or description of item, contract reference, type of. Submittal of 1st material for approval: link with activity a (fs) submittal of 2nd material for approval: link with activity a (fs +14 days) submittal of final material for approval: link with activity a (fs +30 days). the contractor is arranging the materials based on the construction timing in the program..

schedule of material submittals